Request a quoteBuy GPUs
HYPERCUBE
HYPERQ
GPUs
Astra Cybercity
Sectors
Press Room
Company

info@worldoneindia.netWhatsApp +91 93244 08321

Modular AI data centres.

HYPERCUBE and HYPERQ, developed by Quantum AI Connect and brought to India by World One. Thirteen current range entries, from personal AI to campus infrastructure, plus two next-generation designs: SuperPod Ultra and Titan 13.

Two HYPERCUBE SuperPod Ultra modules joined under one sleeve, with the cooling bar behind, in a lakeside mountain setting. Styling concept. Styling concept. Configuration not finalised.

Why modular.

India's demand for AI computing is growing faster than conventional data centres can be planned, financed and built. A modular data centre turns the building into a product: engineered once, integrated in a factory, accepted before it ships and added in steps.

6 monthsis all it can take to install HYPERCUBE units and bring them into service
2 to 3 yearstypically required to build a conventional data centre of comparable capacity
16 to 20 weeksfor a Factory 9 block, once procurement, compliance and site gates release
PUE 1.15 to 1.20design target for the Factory 9 reference architecture
Integration happens on a factory floor, not on a construction site.

Assembled, integrated, proven, released.

Every module passes through the same four gates, whether it is a single rack or one of the nine modules in a Factory 9 block.

Factory acceptance
Power, cooling, network and compute are tested together before the module leaves the hall.
Site acceptance
Connected to grid, cooling plant and fibre on site, then tested again in place.
Workload acceptance
The customer's own workload, or an agreed benchmark, runs before handover.
Handover and lifecycle
Operated as one fleet, with service, monitoring and refresh planned from day one.

The range.

Seven HYPERQ systems for people and teams. Six current HYPERCUBE range entries for enterprises and governments, plus two next-generation designs: the SuperPod Ultra and Titan 13. Explore each system, its specifications and an illustrative exterior rendering.

15 entries · 2 next-generation designs

Compare the range.

Reference figures for each system. Final configuration, pricing and delivery are confirmed by quotation for a named country and end user.

SystemComputeMemoryPowerStatusPrice
Rack R8Managed enterprise rack 8 x RTX PRO 6000; 32,000 AI TOPS768 GB GDDR7, aggregate6 to 12 kWComponents shippingRequest a price
Edge Cell E32Modular regional inference cell 32 x RTX PRO 6000; 128,000 AI TOPS3.07 TB GDDR7, aggregate25 to 40 kW ITBudgetary architectureRequest a price
Core Cell C32Four-node private AI cloud 32 x B300; 576 PFLOPS FP4 sparse. Vera Rubin edition: 1.6 EFLOPS NVFP4About 8.4 TB HBM3e60 to 90 kW ITBudgetary architectureRequest a price
Prime Cell P72Rack-scale AI module GB300 NVL72; 1.44 EFLOPS FP4 sparse. Vera Rubin edition: 3.6 EFLOPS NVFP437 TB, one NVLink domain135 kW rack TDPSubject to allocationRequest a price
Sovereign Cell S72High-assurance rack-scale module GB300 NVL72, high assurance. Vera Rubin edition: 3.6 EFLOPS NVFP437 TB; 1 to 2 PB encrypted storageAs Prime Cell P72Accreditation requiredRequest a price
Factory 9 G576Nine-module AI factory 8 x GB300 NVL72; 11.52 EFLOPS FP4 sparse. Vera Rubin edition: 28.8 EFLOPS NVFP4296 TB fast memory1.25 to 1.45 MW ITReference architectureRequest a price
SuperPod UltraNine packages · design target16 Vera Rubin NVL72 racks; 1,152 Rubin GPUs (target)Subject to final qualified rack configuration5.98 MW IT design envelopeReference architecture; not yet builtDiscuss the architecture
Titan 13 G864SuperPod Ultra, next generation12 x Vera Rubin NVL72 per block; 864 Rubin GPUs; 43.2 EFLOPS NVFP4 inferenceAbout 896 TB fast memory per blockAbout 2.6 to 3.2 MW IT per block, planningNext generation; planning architectureDiscuss the design

From order to operation.

One frozen reference configuration per block, built in the factory and accepted three times before it carries a customer's workload.

Specify

Workload, sovereignty requirements and site conditions fix one frozen reference configuration for each block.

Build and test

Each module is integrated and tested in the factory, and its acceptance evidence travels with it.

Ship

By road and by sea, one module per trailer, with power, cooling and network connections ready to mate.

Install and accept

Set on its plinth, connected and commissioned, then accepted on site and under the customer's workload.

GPUs on their own.

NVIDIA Blackwell Ultra servers and racks for your own facility, or built into HYPERCUBE modules. Supply is by quotation and subject to allocation and export authorisation.

NVIDIA HGX B300

Eight-GPU Blackwell Ultra server node

By inquiry
NVIDIA GB300 NVL72

Liquid-cooled rack: 72 GPUs in one NVLink domain

By inquiry, subject to allocation
NVIDIA Vera Rubin

NVIDIA's next rack-scale platform

By special inquiry

World One works in partnership with Quantum AI Connect, the Abu Dhabi company that owns and develops HYPERCUBE and HYPERQ.

Read the announcement